Panel Upgrades
Upgrade your electrical panel for improved safety, capacity and reliability.

Overview
Older electrical panels can’t keep up with modern power demands and may pose a serious safety risk. Our licensed electricians assess your existing panel and install a properly sized, code-compliant replacement so your home or business has the capacity and protection it needs. Electrovoltage performs 100A and 200A panel upgrades, Federal Pacific and Zinsco panel replacements, and full service upgrades for homes and commercial properties throughout Toronto and the GTA. Every job is permitted and inspected by the Electrical Safety Authority (ESA) so you have documented proof of safe, code-compliant work.
- Full panel replacements and capacity upgrades
- Federal Pacific and Zinsco panel removal
- ESA-compliant installations
We provide panel upgrades across Toronto and the GTA. Have a question first? Contact us or read more about our team.
Why It Matters
A panel upgrade Toronto homeowners ask for is rarely about vanity. It’s almost always triggered by one of a handful of warning signs: breakers that trip under normal load, warm or discoloured breaker switches, flickering lights when appliances start up, or a panel that’s simply out of open slots for a renovation. Homes built with 60A or 100A fuse boxes or panels, and anything carrying a Federal Pacific Electric (FPE) or Zinsco label, are the most common candidates: both brands have a well-documented history of breakers that fail to trip during a fault, which is a genuine fire risk rather than a theoretical one. Beyond safety, capacity is increasingly the driver: EV charging, electric heat pumps, hot tubs, and finished basements all add continuous load that a 100-amp service was never sized for, and most insurers and home inspectors now flag FPE/Zinsco panels directly during a sale or refinance.
How Panel Upgrades Works
- 1
Free load assessment
We inspect your existing panel, service entrance, and typical electrical load, then confirm whether 100A or 200A service fits your home and any planned additions like EV charging.
- 2
Permit & utility coordination
We pull the ESA permit and, where a service upgrade is involved, coordinate the temporary disconnect and reconnect with your local utility so the timeline is predictable.
- 3
Installation day
We replace the panel, breakers, and (if needed) the meter base and mast, keeping the power outage window as short as possible and cleaning up before we leave.
- 4
ESA inspection & documentation
An ESA inspector signs off on the completed work and we hand you the certificate of inspection for your records, insurance, or future home sale.
What Affects the Cost
Panel upgrade pricing depends on more than the panel itself: whether your service entrance and mast are original or need replacing, whether the utility needs to coordinate a meter or transformer change, how accessible the existing panel location is, and whether you’re jumping from 100A to 200A versus a smaller capacity bump. Permit fees and any utility coordination charges are included in your itemized quote, not added as a surprise afterward.
Where We Provide Panel Upgrades
We install and repair panel upgrades for homes and businesses throughout the GTA. Pick your city for local details and to request a free quote:
Frequently Asked Questions
- How do I know if my electrical panel needs an upgrade?
- Frequent breaker trips, flickering lights, a burning smell near the panel, or an older Federal Pacific or Zinsco panel are all signs it may be time for an upgrade. Read our guide on 5 signs your panel needs an upgrade, or call us for a free assessment.
- How long does a panel upgrade take?
- Most residential panel upgrades are completed in a single day, including the ESA inspection process. Commercial upgrades vary depending on building size and scheduling requirements.
- Do I need a permit for a panel upgrade?
- Yes. Every panel upgrade requires an ESA permit and inspection, which we pull and schedule on your behalf as part of the job.
- What size panel do I need, 100A or 200A?
- Most homes with electric heating, EV charging, or major renovations need 200A service, while smaller homes without heavy loads may be fine with 100A. We size your new panel based on your home’s actual electrical load, not guesswork.
- How much does a panel upgrade cost?
- Cost depends on your panel size, service entrance condition, and whether utility coordination is needed. We provide a clear, itemized quote after a free on-site assessment.
Other Services
Get Started
Request a Quote Today
Tell us about your project and we'll get back to you with a free, no-obligation quote.
(416) 828-6976
