- 1. Decide whether you need a repair, a retrofit or a rebuild
- 2. Write the scope as an I/O list
- 3. Ask who will approve the panel
- 4. Treat safety circuits as design work, not accessories
- 5. Demand maintainable software
- 6. Plan the network and cyber-security
- 7. Specify the handover package
- 8. Understand what drives the cost
- What happens next
A machine that stops every few shifts, a controller the manufacturer no longer supports, or a new line that arrives without a working control system: these are the usual reasons a plant manager starts looking at PLC programming and control panels. The projects are rarely hard to describe, but they go wrong in predictable ways. This guide covers what to settle before anyone orders parts.
1. Decide whether you need a repair, a retrofit or a rebuild
- Repair: the logic is sound and a component has failed. Fix the part and document the panel.
- Retrofit: the controller or drives are obsolete, parts are scarce, or the machine needs new functions. Replace the hardware and migrate or rewrite the program.
- Rebuild: the panel is undocumented, modified many times, or unsafe. Start from a clean design and a written sequence of operation.
An honest assessment of the existing panel decides which one you are paying for. Ask whoever quotes the work to back up the current program and photograph the panel before proposing anything.
2. Write the scope as an I/O list
The most useful document in any automation project is the I/O list: every input and output, what it connects to, its voltage and signal type. It fixes the PLC size, the number of terminals and the wiring effort, and it is the cleanest basis for comparing quotes. Add the drives, servos, safety devices, network connections and HMI screens, and you have a scope that two contractors can price on equal terms.
3. Ask who will approve the panel
Electrical equipment used in Ontario has to be approved, usually through a recognized certification mark. One-off machine panels often have none, so they need a field evaluation or special inspection through the Electrical Safety Authority or an accredited body. The panel also needs a documented short-circuit current rating and correctly sized protection. Raising this at the start avoids a finished machine that cannot be energized.
4. Treat safety circuits as design work, not accessories
Emergency stops, guard interlocks and light curtains should come from a risk assessment, with a reliability level chosen to suit the hazard (the ISO 13849-1 performance level approach is common) and validation before the machine is released. In Ontario, new or modified machinery may also require a pre-start health and safety review under Regulation 851. The technical file your contractor produces should make that review straightforward.
5. Demand maintainable software
Programs are usually written in one of the languages defined by IEC 61131-3: ladder logic, function block diagram, structured text and others. Whatever the language, look for consistent naming, comments, a clear separation of modes (auto, manual, fault), and alarms that say what is wrong and where to look. Your own maintenance team should be able to read it.
6. Plan the network and cyber-security
Machines are increasingly connected to SCADA, reporting systems or remote support. Keep the control network separate from the office network, use named accounts, close what you do not need, and agree in writing how remote access works. Industrial security guidance such as IEC 62443 is a useful reference for what good looks like.
7. Specify the handover package
Before you sign, list what you will own at the end:
- Editable electrical drawings and PDFs
- I/O list, panel layout and bill of materials
- Commented PLC and HMI programs
- A backup of the final code and device settings
- ESA documentation where it applies
- Operator and maintenance training
If any item is missing, you may find yourself unable to change your own machine in two years.
8. Understand what drives the cost
Price is shaped by I/O count, drives and servos, safety scope, HMI size, enclosure type (washdown panels cost more than painted steel), approvals and, for retrofits, how much undocumented logic must be traced first. A quote that separates design, panel build, programming and commissioning lets you phase the work.
What happens next
If you are weighing a retrofit or a new panel, we can walk the machine, review the existing panel and send a written scope. Call (416) 828-6976 or use the quote form on the service page. For plant electrical faults that are not tied to the controller, see our industrial electrician service, and for motor circuits, three-phase motor wiring.